Roof Replacement guide

How much should you pay a roofer up front in Washington?

No WA law caps roofing deposits. What L&I and the Attorney General advise, the required Notice to Customer, lien releases and your right to cancel.

Short answer: Washington has no state law capping a roofing deposit. L&I advises a reasonable down payment, then paying as phases of work are finished, and the Attorney General's office suggests limiting the first payment to 10 to 20 percent. Get a written contract, the required Notice to Customer, and lien releases before you make the final payment.

There is no deposit cap in Washington

Some states limit how much a contractor can collect before work starts. Washington does not. We found no Washington statute or L&I rule that sets a maximum deposit for a residential roofing job. The amount is whatever you and the contractor agree to in the contract.

What the state does offer is guidance. L&I's Hire Smart page says to pay a reasonable down payment and then pay only when specific phases of the project are done, not on a calendar schedule. It also says to withhold a portion of payment until all work is complete and to avoid paying in full before then. The Attorney General's office gives a number: limit the initial down payment to 10 to 20 percent so you can hold back the final amount based on performance.

Roofing has one wrinkle. Materials are a big share of the cost and are often ordered before the crew arrives. L&I suggests that if a deposit is for materials, you can ask to make checks payable to both the contractor and the supplier.

The Notice to Customer you should receive

Washington law, RCW 18.27.114, requires a contractor to give you a Disclosure Statement Notice to Customer before starting work on a residential project of $1,000 or more, for four or fewer units. You sign it, and the contractor keeps a signed copy.

The notice tells you the contractor's registration and bond details and explains, in capital letters, that your property may be liened. It also says you may withhold a percentage of your contract for greater protection. A contractor who skips this notice cannot bring or keep a lien claim without proving you received it, and failing to provide it is an infraction.

If a roofer wants a deposit and has not mentioned this form, ask for it. Its absence tells you something about how the rest of the job will be run.

Want this answered for your roof? Get a free written estimate.

Liens and lien releases

Here is the risk the Notice to Customer warns about. If your roofer does not pay the supplier or a subcontractor, that unpaid party may be able to file a lien against your house, even though you paid the roofer. L&I notes a lien may be filed within 90 days of work stopping or materials being delivered.

L&I's advice is to request a completed lien release from all major subcontractors and suppliers before you make the final payment. On a typical re-roof, that usually means the shingle or metal supplier, plus any subcontractor such as a gutter installer. Paying materials with a two-party check, as described above, helps too.

Holding back the final payment until the job is done, inspected and the releases are in hand is the single best protection you have.

Your 3-day right to cancel

Two rules may apply when you sign a roofing contract at your kitchen table instead of at the contractor's office.

The federal FTC Cooling-Off Rule gives you until midnight of the third business day after the sale to cancel for a full refund when a sale of $25 or more is made at your home, or $130 or more at a temporary location like a home show. It does not cover purchases needed to meet an emergency. Saturdays count as business days. Sundays and federal holidays do not.

Washington's own statute, RCW 63.14.154, covers retail installment transactions, meaning contracts paid over time through the seller, that were solicited in person or by phone away from the seller's place of business. You can cancel by certified mail, return receipt requested, by midnight of the third day after signing, not counting Sundays and holidays. The seller must refund deposits within ten days. The Washington Attorney General's cancellation-rights page summarizes both.

A sensible way to structure payments

Every job is different, and the right schedule is the one written into a contract you understand. These points follow the L&I and Attorney General guidance above. Read the whole contract before you sign it, and if a contractor pressures you to sign the same day, take that as a reason to slow down.

A schedule like the one below keeps your money moving in step with the work. You are never far ahead of what has been delivered, and the contractor knows exactly what triggers each payment. That clarity protects both sides.

  • Get everything in writing: scope, materials, price with sales tax, payment terms, and how changes are handled.
  • Keep the deposit modest. The AG suggests 10 to 20 percent.
  • Tie each payment to a finished stage, such as materials delivered or tear-off and dry-in done, not to a date.
  • Pay by check or card, not cash, so there is a record.
  • Hold the final payment until the work is complete, the site is clean, and you have lien releases.
  • Treat a demand for most of the money up front, or for cash, as a red flag.

Roof Replacement in Skagit & Snohomish County

Full tear-off and roof replacement for Skagit & Snohomish County homes, with a written line-item scope and a clean site at the end of every day.

About our roof replacement service

Frequently asked questions

How much should you pay a roofer up front?

Washington sets no cap. L&I advises a reasonable down payment with later payments tied to finished work, and the Attorney General suggests keeping the first payment to 10 to 20 percent. Hold back the final payment until the job is done and lien releases are in hand.

Is there a legal limit on contractor deposits in Washington?

We found no Washington statute or L&I rule that caps a residential roofing deposit. The amount is set by your contract, which is why the payment terms deserve a careful read.

Can I cancel a roofing contract after signing it?

Possibly. The FTC Cooling-Off Rule gives three business days for sales of $25 or more made at your home, with an emergency exception. RCW 63.14.154 gives a three-day right for retail installment contracts solicited away from the seller's business. Check your contract and send cancellation by certified mail.

What is the Notice to Customer?

It is a disclosure required by RCW 18.27.114 before work starts on residential jobs of $1,000 or more. It lists the contractor's registration and bond and explains that your property may be liened.

More homeowner guides

Free estimate

Get a straight answer and a written quote

Free on-site estimate, a written line-item quote, and no pressure to decide on the spot.

  • Licensed, bonded & insured
  • Free written estimates
  • Locally owned in Sedro-Woolley